Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Camille Rayon Harbour

Antibes France

 

Project

Renovation of the existing marina and replacement of docks.

The Port Camille Rayon marina is a high-end facility located in the south of France. With the “Blue Flag” or “Clean Marine” designation for more than 20 years, respect for the environment and for a healthy ecosystem has been a top priority for the marina.

The marina has 841 slips for boats ranging from 6 to 75 metres in length.

 

Technical traits

The renovation of the marina consisted in part of replacing existing infrastructure; whilst maintaining the operations of the facility – a significant challenge for any existing marina operation – let alone an 800+ marina. However, this was successfully accomplished by the expert team at Poralu Marine.

In order to respect the day-to-day operations and the needs of moorage for the clients, the existing infrastructure was reinforced with the technical know-how of Poralu Marine as the new docks were being installed and anchored. This allowed for the smooth transition and installation of the dock infrastructure.

The selected decking for the docks was Poralu Marine’s premium-line composite wood decking, a beautiful fit for this luxurious facility.

 

Services

Poralu Marine completed the manufacturing, anchoring, and installation of the new docks in the marina.

 

http://www.portcamillerayon.net/